The total project supposes $ 4.6 billion approximately, close to 2,000 rooms which are distributed in three structures. The Lisboa Palace Hotel, the Palazzo Versace Macau and the Karl Lagerfeld Hotel with a luxury boutique, a casino of 27,000 m2 with more than 700 gambling tables and 1,200 gambling machines, Michellin starred restaurants, a shopping center and some food and beverage establishments.
A theatre and a pavilion for wedding celebrations are in the project as well. Total built area is 521.500 m2 approximately, plus 77,200 m2 of car park and 37,400 m2 of gardens.

THE PROJECT

The total project supposes $ 4.6 billion approximately, close to 2,000 rooms which are distributed in three structures. The Lisboa Palace Hotel, the Palazzo Versace Macau and the Karl Lagerfeld Hotel with a luxury boutique, a casino of 27,000 m2 with more than 700 gambling tables and 1,200 gambling machines, Michellin starred restaurants, a shopping center and some food and beverage establishments.
A theatre and a pavilion for wedding celebrations are in the project as well. Total built area is 521.500 m2 approximately, plus 77,200 m2 of car park and 37,400 m2 of gardens.

STAKEHOLDERS
PROJECT OWNER PT : Macau’s Sociedade de Jogos de Macau, S.A. (SJM)
CONTRACTOR : Companhia de Engenharia Iao Lek Limitada
MEP CONSULTANT :
- Arup
- JRP
ARCHITECT ( Local ) : WATG
STAKEHOLDERS

PROJECT OWNER PT : Macau’s Sociedade de Jogos de Macau, S.A. (SJM)