MSHEIREB DOWNTOWN DOHA
We have selected case studies demonstrating that cast iron drainage solution are the choice for demanding owners who are looking for durability, acoustic and fire safety for their buildings.
THE PROJECT
Msheireb means "a place to drink water" in Arabic. It is a QR20 billion (US$5.5 billion, €4.18 billion) project, covering an area of 31 hectares (77 acres) (310,000 square metres) offering a maximum floor space quantum of 764,176 square metres. Msheireb Downtown Doha is a planned city in Doha, Qatar. Initial construction began in January 2010. The project is a flagship project for Msheireb Properties, and aims to preserve the historical downtown area of Doha. It will revive the old commercial heart of the city through a new architectural language that is based on community living.
THE PROJECT
Msheireb means "a place to drink water" in Arabic. It is a QR20 billion (US$5.5 billion, €4.18 billion) project, covering an area of 31 hectares (77 acres) (310,000 square metres) offering a maximum floor space quantum of 764,176 square metres. Msheireb Downtown Doha is a planned city in Doha, Qatar. Initial construction began in January 2010. The project is a flagship project for Msheireb Properties, and aims to preserve the historical downtown area of Doha. It will revive the old commercial heart of the city through a new architectural language that is based on community living.
STAKEHOLDERS
PROJECT OWNER : Msheireb Properties (Qatar Fondation)
CONTRACTOR : Hyundai, Hamad Bin Khalid, Carillion, Brookfiled, Medgulf, Arabtec, Obayashi
MEP CONSULTANT : Several
ARCHITECT : Several
STAKEHOLDERS
PROJECT OWNER : Msheireb Properties (Qatar Fondation)
CONTRACTOR : Hyundai, Hamad Bin Khalid, Carillion, Brookfiled, Medgulf, Arabtec, Obayashi
MEP CONSULTANT : Several
ARCHITECT : Several